The Eastern Regional Minister, Rita Akosua Adjei Awatey, has ordered the suspension of the ongoing China Mall construction project in Koforidua following concerns over inadequate drainage and flood control measures at the site.
The directive comes after repeated complaints from residents in surrounding communities, who say the area has experienced persistent flooding and waterlogging during periods of heavy rainfall.
According to the Minister, the developers failed to fully comply with earlier instructions aimed at resolving the drainage challenges linked to the construction works. She explained that the suspension is intended to allow for corrective measures to be implemented before any further development resumes.
Residents have expressed growing concern that, without proper drainage infrastructure, the project could worsen existing flood risks in nearby neighbourhoods, particularly during the rainy season.
The Minister emphasised that safeguarding lives and property remains a top priority for the regional administration, stressing that all developers must adhere strictly to environmental and safety regulations before being permitted to continue work on the project.




