The Herald ghanaThe Herald ghana
  • Home
  • General
  • Entertainment
  • Politics
  • Editorial
  • Business
  • Sports
  • Feature
  • Health
  • World
Reading: Water crisis looms in Volta Region as GWL shuts Kpeve treatment plant over extreme turbidity
Share
Aa
The Herald ghanaThe Herald ghana
Aa
  • Home
  • General
  • Entertainment
  • Politics
  • Editorial
  • Business
  • Sports
  • Feature
  • Health
  • World
Search
  • Home
  • General
  • Entertainment
  • Politics
  • Editorial
  • Business
  • Sports
  • Feature
  • Health
  • World
Follow US
  • Advertise
Copyright © 2022 The Herald Ghana. All Rights Reserved
GeneralMajor 3

Water crisis looms in Volta Region as GWL shuts Kpeve treatment plant over extreme turbidity

Published May 17, 2026 5 Min Read
Share
5 Min Read
SHARE

Source: GNA

Thousands of residents in the Volta Region face the threat of recurring water shortages after Ghana Water Limited (GWL) temporarily shut down operations at the Kpeve Water Treatment Plant over extreme turbidity levels in its raw water source.

The company said worsening environmental degradation around the facility had made water treatment technically unsafe and operationally impossible, raising fears of a looming water crisis in the Ho Municipality and adjoining districts.

Communities expected to be affected include Ho, South Dayi, Afadzato South, and nearby areas that depend on the Kpeve plant for potable water supply.

In a statement, GWL said severe siltation and pollution of the plant’s intake source had forced the shutdown, renewing concerns over encroachment and construction activities within the protected buffer zone around the facility.

More Read

GWL admits inability to guarantee 24-hour water supply nationwide

Mahama allocates additional GH¢500m for district housing projects in Volta Region
Volta Region to benefit from 2027 budget investments – Mahama
New South Tongu NDC Chairman pledges unity, peace and development

“The current turbidity levels have exceeded the acceptable operational threshold required for safe and effective water treatment, thereby making continued production technically unsafe and operationally impossible,” the company said.

Management described the situation as alarming, explaining that raw water entering the treatment facility had become excessively muddy due to heavy rains and ongoing land disturbances around the intake area.

GWL linked the crisis to activities of BSK City Developers, a private developer involved in a longstanding dispute with the company over construction works near the Kpeve intake point.

The company said the developer allegedly continued construction activities despite directives from the Volta Regional Coordinating Council ordering a halt to all works within the protected buffer zone.

According to officials, nearby hills had been graded, large portions of land excavated, and loose topsoil dumped dangerously close to the water source, exposing the area to severe erosion during rainfall.

With natural vegetation removed, runoff water now carries large volumes of sediment directly into the intake channel, resulting in massive siltation and muddy water conditions beyond the plant’s treatment capacity.

GWL said the current situation confirmed earlier warnings issued by management regarding the consequences of human activities around critical water infrastructure.

Managing Director of Ghana Water Ltd, Mr Adam Mutawakilu, had, during an inspection visit to Kpeve Tornu in October 2025, warned about the dangers of encroachment near the intake point.

“The situation clearly demonstrates the dangers associated with encroachment and environmentally harmful activities around critical water infrastructure,” he said in a media interview.

The company warned that the problem extended beyond rainfall alone, stressing that recreational developments and other human activities around the intake area could continuously compromise water quality through waste disposal, land disturbance, and pollution.

It said debris from recreational activities, including plastics and food waste, could further contaminate the water body and worsen siltation over time.

The Kpeve Water Treatment Plant supplies potable water to thousands of residents in the Volta Region and has an installed production capacity of 18,181 cubic metres per day.

GWL cautioned that repeated shutdowns could severely disrupt water supply to homes, schools, and health facilities while placing additional pressure on the company’s infrastructure and finances.

The company further warned that if encroachment around the intake area continued unchecked, it could eventually be forced to suspend water production for longer periods during rainy seasons.

Beyond the immediate operational challenges, GWL said failure to protect the Kpeve water source could create long-term environmental damage with serious consequences for public health and economic activities in the region.

The crisis has triggered renewed calls for intervention by traditional authorities, political leaders, environmental regulators, and the Ministry of Works, Housing, and Water Resources.

GWL urged chiefs and opinion leaders to help protect the water buffer zone from further encroachment and called on institutions, including the Environmental Protection Agency, National Security and local assemblies to enforce regulations and halt harmful activities around the intake area.

Stanley Martey, Chief Manager of Public Relations and Communication, said technical teams were monitoring the situation and operations would resume only after turbidity levels reduced to safe operational thresholds.

Meanwhile, consumers have been advised to use available water judiciously as uncertainty grows over how long the shutdown may last.

You Might Also Like

GWL admits inability to guarantee 24-hour water supply nationwide

Mahama allocates additional GH¢500m for district housing projects in Volta Region

Volta Region to benefit from 2027 budget investments – Mahama

New South Tongu NDC Chairman pledges unity, peace and development

ab.teye May 17, 2026
Share this Article
Facebook Twitter Whatsapp Whatsapp Copy Link
What do you think?
Love0
Sad0
Cry0
Happy0
Surprise0
Angry0
Wink0
Previous Article “Our financial position remains strong and resilient” — Ecobank speaks after GH¢6.16m court defeat
Next Article Chelsea appoint Xabi Alonso as new manager on four-year deal

Stay Connected

Facebook Like
Twitter Follow
Instagram Follow
Youtube Subscribe
- Advertisement -
Ad imageAd image

Latest News

Cassiel Ato Forson/infrastructure/2025 Mid-Year Budget Statement
Parliament to receive 2027 Budget at 6pm on November 12
General Major 3 November 10, 2026
President’s Office closes petition against Supreme Court Justice Pwamang
General Major 1 November 10, 2026
Korle Bu’s main 24-hour pharmacy to undergo eight-week renovation
Health Major 3 November 10, 2026
Mohammed Amin Adam/NPP/NDC
Minority questions GH¢110m allocation to 24-Hour Economy, demands results before new agenda
General Major 2 November 10, 2026
CurrencyRate

You Might also Like

GeneralMajor 3

GWL admits inability to guarantee 24-hour water supply nationwide

November 10, 2026
GeneralMajor 4

Mahama allocates additional GH¢500m for district housing projects in Volta Region

November 8, 2026
GeneralMajor 3

Volta Region to benefit from 2027 budget investments – Mahama

November 8, 2026
Major 3Politics

New South Tongu NDC Chairman pledges unity, peace and development

October 30, 2026
Show More

Copyright © 2022-2025 The Herald Ghana. All Rights Reserved

Removed from reading list

Undo
Welcome Back!

Sign in to your account

Lost your password?