Reading: US$33.3 million arbitral award against Justmoh Construction set aside
Share
Aa
The Herald ghanaThe Herald ghana
Aa
  • Home
  • General
  • Entertainment
  • Politics
  • Editorial
  • Business
  • Sports
  • Feature
  • Health
  • World
Search
  • Home
  • General
  • Entertainment
  • Politics
  • Editorial
  • Business
  • Sports
  • Feature
  • Health
  • World
Follow US
  • Advertise
Copyright © 2022 The Herald Ghana. All Rights Reserved
BusinessMajor 1

US$33.3 million arbitral award against Justmoh Construction set aside

Published May 8, 2026 9 Min Read
Share
9 Min Read
SHARE

An Accra High Court (Commercial Division 2), presided over by Justice John-Mark Nuku Alifo, on Wednesday, 6th May 2026, set aside in its entirety the final arbitral award dated the 10th December 2025 in which Ashanti Port Services Limited (APSL) had obtained an order against Justmoh Construction Limited for the repayment of US$33,300,000.00, together with interest and consequential reliefs, in connection with the Boankra Inland Logistics Terminal Project.

The Court accepted submissions from lead counsel for Justmoh Construction Limited, Prof. Kwame Gyan, that Ashanti Port Services Limited lacked corporate capacity, that its board was not properly constituted under the Shareholders’ Agreement, that it had no cause of action, and that participation in the arbitration did not waive Justmoh’s jurisdictional objections, with the principle of unjust enrichment also weighing against the award.

In a forty-page ruling, the Court allowed the application brought by Justmoh Construction Limited under section 58 of the Alternative Dispute Resolution Act, 2010 (Act 798). At the commencement of its ruling, the Court took care to clarify that the application before it was not an appeal against the merits of the arbitral award, but a supervisory application to set aside an arbitral award within the limited statutory grounds prescribed by section 58 of Act 798.

The application for the Applicant was led by Prof. Gyan, whose submissions the Court accepted in substantial measure on each of the principal grounds.

Background to the Application

More Read

Afia Schwarzenegger challenges legal basis for 63-day jail term

Adu-Boahene challenges prosecution’s claims ahead of no-case ruling
Manhyia South MP’s EOCO case linked to SIC Life’s GH¢300 million rot
High Court issues warrant for arrest of Manhyia South MP

The dispute arose out of the development of the Boankra Inland Logistics Terminal, a flagship inland port project structured as a concession arrangement involving the Government of Ghana, acting through the Ministry of Transport and the Ghana Shippers’ Authority (GSA), with the Ghana Ports and Harbours Authority (GPHA) and Afum Quality Limited as participating shareholders. APSL was incorporated as the concessionaire vehicle for the Project, with its corporate governance regulated by a Shareholders’ Agreement that fixed a multi-stakeholder board composed of nominees of Afum Quality Limited, GPHA, and GSA.

In August 2022, APSL engaged Justmoh Construction Limited as the EPC Contractor for Phase 1A of the Project under an Engineering, Procurement and Construction Contract. In breach of the terms of its own engagement, APSL failed to raise the necessary funds to commence the Project and thereby failed to reach Financial Close.

Subsequently, the Ghana Ports and Harbours Authority was directed to acquire shares in APSL, pursuant to which GPHA paid US$33.3 million for its share subscription, and the said sum was applied as the advance mobilisation payment under the EPC Contract. The funds were paid into Justmoh’s account directly in September 2022 to enable Justmoh commence works on the project site.

APSL’s failure to achieve Financial Close ultimately led the GSA to terminate the underlying Concession Agreement effective the 5th day of August 2023. The Government of Ghana, acting through the Ministry of Transport, thereafter took possession and control of the project infrastructure, materials, plant, and site, and directed Ghana Ports and Harbours Authority to assume management of the Project going forward.

On the 18th day of October 2023, Justmoh issued a notice of termination of the EPC Contract, citing material breaches by APSL, including non-payment of certified Interim Payment Certificates. Notwithstanding that the State had already terminated the underlying concession and stepped in, APSL filed a Notice of Arbitration at the Ghana Arbitration Centre on the 19th day of December 2023.

A board meeting purportedly ratifying the institution of the arbitration was thereafter held on the 25th day of January 2024, in the absence of the nominee directors of GPHA and GSA. On the 10th day of December 2025, the arbitral tribunal delivered its final award ordering Justmoh to refund US$33.3 million, together with interest and consequential relief. Justmoh thereafter filed the present application, within the statutory time limit, seeking to set the award aside under section 58 of Act 798.

The Court’s Ruling

The Court set aside the arbitral award on the following grounds: APSL lacked the capacity to commence the arbitration, and capacity cannot be acquired midway. The Court held that Ashanti Port Services Limited did not have the requisite capacity when the arbitration proceedings were instituted on the 19th day of December 2023. The company failed to seek and obtain the required board authorisation prior to initiating the arbitration.

The Court was firm that the ex post facto attempt to ratify the Chief Executive Officer’s decision to refer the dispute to arbitration could not cure a fundamental defect which goes to the very root of the case. Capacity, the Court emphasised, goes to jurisdiction. The purported board meeting held on the 25th of January 2024, at which APSL sought to ratify the CEO’s earlier unauthorised act, also failed because capacity must be present when the proceedings are initiated and cannot be acquired midway.

The Court further raised the issue of the board’s composition. It found that the board that purportedly authorised or ratified the arbitration was not properly constituted when the board resolution was made. The composition of the board did not accord with the requirements of the Shareholders’ Agreement governing APSL, under which the board was to be drawn from nominees of the participating stakeholders, including the Ghana Ports and Harbours Authority and the Ghana Shippers’ Authority. A resolution passed by a board which is not properly constituted in accordance with the Shareholders’ Agreement could not, in the view of the Court, operate as the lawful act of the company.

Participation in the arbitration did not amount to a waiver of jurisdictional objections. The Court rejected APSL’s contention that, by taking part in the arbitral proceedings, Justmoh had waived its right to challenge jurisdiction. According to the Honourable Court, the doctrine of waiver applies only in respect of minor procedural irregularities, and not in respect of matters going to jurisdiction.

APSL had no cause of action at the time of the arbitration. The Court further held that, at the time the arbitration was commenced, APSL did not have a cause of action against Justmoh. The termination of the Concession Agreement by the GSA, and the exercise by the Government of Ghana, acting through the Ministry of Transport, of its step-in rights under the Concession Agreement, had stripped APSL of any subsisting right of action in respect of the Project. On the source of funds, the Court found, on the evidence on record, that the sum of US$33.3 million had in fact been paid by the Ghana Ports and Harbours Authority for the subscription of shares in APSL, and not as a loan recoverable by APSL from Justmoh.

Observations on Unjust Enrichment

Beyond the principal grounds upon which the award was set aside, the Court further observed that the principle of unjust enrichment weighed heavily against the relief APSL had sought. It would, in the view of the Court, be unfair for APSL to receive, by way of refund, monies which were not in fact advanced by it; and equally unjust to permit APSL to benefit from its own wrong, having itself been responsible for the breach of contract which led to the State’s intervention in the first place.

The sum of US$33.3 million, having, on the evidence on record, been paid by the Ghana Ports and Harbours Authority for the subscription of shares in APSL, could not properly be characterised as a loan or advance recoverable by APSL from Justmoh.

As a result, the Court set aside the arbitral award dated 10th December 2025 in its entirety.

You Might Also Like

Afia Schwarzenegger challenges legal basis for 63-day jail term

Adu-Boahene challenges prosecution’s claims ahead of no-case ruling

Manhyia South MP’s EOCO case linked to SIC Life’s GH¢300 million rot

High Court issues warrant for arrest of Manhyia South MP

razak.bawa May 8, 2026
Share this Article
Facebook Twitter Whatsapp Whatsapp Copy Link
What do you think?
Love0
Sad0
Cry0
Happy0
Surprise0
Angry0
Wink0
Previous Article GHS receives ultrasound machines to boost breast cancer diagnosis
Next Article NDC accuses NPP of reviving old propaganda playbook

Stay Connected

Facebook Like
Twitter Follow
Instagram Follow
Youtube Subscribe
- Advertisement -
Ad imageAd image

Latest News

court hammer/coup/marriage
Court of Appeal upholds life sentence for Jirapa Dubai hotel murder convict
General Major 4 November 19, 2026
Tottenham man arrested in Dublin over fatal stabbing of 21-year-old in North London
General Major 2 November 19, 2026
Emirates tops Time’s inaugural World’s Best Airlines 2027 rankings
Business Major 2 November 19, 2026
South Africa: Alex Dadey champions intergenerational African businesses, technology and regional partnerships at CNBC Africa Forum
Business Major 1 November 19, 2026
CurrencyRate

You Might also Like

GeneralMajor 2

Afia Schwarzenegger challenges legal basis for 63-day jail term

November 17, 2026
Adu Boahene/National Security Records/Samuel Atta Akyea/Srem Sai
GeneralMajor 3

Adu-Boahene challenges prosecution’s claims ahead of no-case ruling

October 27, 2026
GeneralMajor 1

Manhyia South MP’s EOCO case linked to SIC Life’s GH¢300 million rot

October 2, 2026
GeneralMajor 1

High Court issues warrant for arrest of Manhyia South MP

September 30, 2026
Show More

Copyright © 2022-2025 The Herald Ghana. All Rights Reserved

Removed from reading list

Undo
Welcome Back!

Sign in to your account

Lost your password?