The Ministry of Roads and Highways Ghana has confirmed that the driver of the trailer that collided with the North Dzorwulu Pedestrian Footbridge will bear the full cost of repairing the structure.
The Ministry said the driver has been apprehended and is currently in police custody as investigations continue.
Speaking to the media on Monday, February 16, the Head of the Public Relations Unit at the Ministry, Nasir Ahmed Yartey, said authorities are fully in control of the situation.
“The issue has come to our attention, and the culprit has been apprehended. The police are in full control, and we are dealing with it,” he stated.
Following the incident, engineers from the Ghana Highway Authority carried out an emergency inspection of the bridge and identified significant localised structural damage caused by the impact.
“The estimate for the repair of the bridge has been put at around GH¢2.5 million, and the culprit is going to fully fund the repair works. We are going to ensure that this is done,” Mr Yartey added.
The Ministry noted that once the repair programme is initiated, the work is expected to be completed within six days.
The North Dzorwulu Pedestrian Footbridge, located along a busy highway in Accra, developed visible cracks after the collision, with sections shifting and fittings damaged. Pedestrians who rely on the bridge have expressed concern over their safety, urging prompt repairs to prevent accidents while restoration is carried out.




