The Herald ghanaThe Herald ghana
  • Home
  • General
  • Entertainment
  • Politics
  • Editorial
  • Business
  • Sports
  • Feature
  • Health
  • World
Reading: ECG deploys mobile transformer to boost power supply in Tse Addo
Share
Aa
The Herald ghanaThe Herald ghana
Aa
  • Home
  • General
  • Entertainment
  • Politics
  • Editorial
  • Business
  • Sports
  • Feature
  • Health
  • World
Search
  • Home
  • General
  • Entertainment
  • Politics
  • Editorial
  • Business
  • Sports
  • Feature
  • Health
  • World
Follow US
  • Advertise
Copyright © 2022 The Herald Ghana. All Rights Reserved
BusinessMajor 1

ECG deploys mobile transformer to boost power supply in Tse Addo

Published May 7, 2025 3 Min Read
Share
3 Min Read
SHARE

… Ignores Adenta communities

As part of ongoing efforts to improve power reliability in the Tse Addo area of the Greater Accra Region—home to many of Ghana’s elite—the Electricity Company of Ghana (ECG), has selectively deployed a mobile transformer to enhance electricity supply and ease pressure on existing infrastructure.

The mobile transformer, with a capacity of 20/26 Mega Volt Amperes (MVA) and operating at 33/11 Kilovolts (kv), has been temporarily installed in Tse Addo, where several of the country’s key decision-makers reside, to offload part of the burden from the overstretched La Primary Substation.

In stark contrast, ECG, has continued to ignore repeated appeals from residents of the Lakeside communities near Ashaley Botwe in the Adenta Municipality.

These residents suffer from persistent low voltage, frequent power outages, and damage to household appliances due to an unreliable electricity supply.

More Read

ECG

ECG announces power outages in Accra East, Tema from November 8 to 13

EOCO’s poor job in PDS/ECG scandal probe revealed
ECG unions to demonstrate nationwide against private sector participation
Accra Floods: Put away the politics and help those in need – Alhaji Amin appeals for corporate support 

The installation process, began early on Monday, with the unit transported to the Burma Hill site at approximately 2 a.m.

Speaking ahead of the installation, Ing. Emmanuel Kwame Addo, Maintenance Manager at ECG Subtransmission in Accra, said the move is temporary, but necessary, as the La Primary Substation is currently operating above 100 per cent capacity.

“Ideally, a transformer should carry a load of around 70 per cent. What we have now is a transformer running beyond its safe limit,” he explained.

“This mobile unit will allow us to transfer some of the load from the La Primary Substation and create room to upgrade the existing transformer to meet the growing demand.”

Tse Addo, a fast-developing enclave known for its upscale residential and commercial developments, has faced increasing challenges with power stability due to rising energy consumption.

Ing. Addo, also urged residents to support ECG’s efforts by conserving electricity where possible.

The mobile transformer was previously stationed at Agbogba, where it helped stabilise the power supply before being decommissioned and relocated to Tse Addo.

According to ECG, once conditions in Tse Addo stabilise, the unit will be moved to another area, where it will experience similar power challenges.

Ing. Addo, concluded that deploying the mobile transformer underscores ECG’s commitment to ensuring a reliable regional electricity supply, even as long-term infrastructure improvements are pursued.

You Might Also Like

ECG announces power outages in Accra East, Tema from November 8 to 13

EOCO’s poor job in PDS/ECG scandal probe revealed

ECG unions to demonstrate nationwide against private sector participation

Accra Floods: Put away the politics and help those in need – Alhaji Amin appeals for corporate support 

razak.bawa May 7, 2025
Share this Article
Facebook Twitter Whatsapp Whatsapp Copy Link
What do you think?
Love0
Sad0
Cry0
Happy0
Surprise0
Angry0
Wink0
Previous Article Parliamentary Committee on Works and Housing inspects key housing projects
Next Article NHIA Boss reveals GHC 965 million payment to service providers

Stay Connected

Facebook Like
Twitter Follow
Instagram Follow
Youtube Subscribe
- Advertisement -
Ad imageAd image

Latest News

court hammer/coup/marriage
Court of Appeal upholds life sentence for Jirapa Dubai hotel murder convict
General Major 4 November 19, 2026
Tottenham man arrested in Dublin over fatal stabbing of 21-year-old in North London
General Major 2 November 19, 2026
Emirates tops Time’s inaugural World’s Best Airlines 2027 rankings
Business Major 2 November 19, 2026
South Africa: Alex Dadey champions intergenerational African businesses, technology and regional partnerships at CNBC Africa Forum
Business Major 1 November 19, 2026
CurrencyRate

You Might also Like

ECG
GeneralMajor 1

ECG announces power outages in Accra East, Tema from November 8 to 13

November 8, 2026
GeneralMajor 1

EOCO’s poor job in PDS/ECG scandal probe revealed

October 12, 2026
ECG
GeneralMajor 3

ECG unions to demonstrate nationwide against private sector participation

September 25, 2026
GeneralMajor 2

Accra Floods: Put away the politics and help those in need – Alhaji Amin appeals for corporate support 

July 3, 2026
Show More

Copyright © 2022-2025 The Herald Ghana. All Rights Reserved

Removed from reading list

Undo
Welcome Back!

Sign in to your account

Lost your password?