The Herald ghanaThe Herald ghana
  • Home
  • General
  • Entertainment
  • Politics
  • Editorial
  • Business
  • Sports
  • Feature
  • Health
  • World
Reading: Work on transmission lines won’t lead to power outages – GRIDCo
Share
Aa
The Herald ghanaThe Herald ghana
Aa
  • Home
  • General
  • Entertainment
  • Politics
  • Editorial
  • Business
  • Sports
  • Feature
  • Health
  • World
Search
  • Home
  • General
  • Entertainment
  • Politics
  • Editorial
  • Business
  • Sports
  • Feature
  • Health
  • World
Follow US
  • Advertise
Copyright © 2022 The Herald Ghana. All Rights Reserved
Business

Work on transmission lines won’t lead to power outages – GRIDCo

Published April 11, 2022 1 Min Read
Share
1 Min Read
SHARE

The Ghana Grid Company (GRIDCo) has denied media reports suggesting that it has a scheduled 84 days of power outages.

In a statement seen by Starrfm.com.gh, the Management of GRIDCo, however, confirmed that it has started work on some transmission lines but says it will necessitate continuous power outages.

“Whilst we confirm the reconstruction work on our transmission lines has commenced since Saturday April 9, 2022 we wish to assure the public that the ongoing work will not lead to any DUMSOR.

“For the information of the public, Phase 1 of the reconstruction exercise of the transmission line from Mallam Substation to Avenor was undertaken and successfully completed in November 2021 without any significant disturbance to power delivery in Accra and its environs. Phase 2 of the exercise from Achimota Substation to Avenor will similarly not disrupt power delivery in Accra.”

Attached is the full statement from GRIDCo

More Read

National grid fault triggers widespread blackout as GRIDCo launches investigation

Selective retirement for energy sector chiefs raise questions
Power outages, weeds disrupt water supply in parts of Accra, Tema – GWL
Fire chaos forces Akosombo shutdown as GRIDCo substation gutted

You Might Also Like

National grid fault triggers widespread blackout as GRIDCo launches investigation

Selective retirement for energy sector chiefs raise questions

Power outages, weeds disrupt water supply in parts of Accra, Tema – GWL

Fire chaos forces Akosombo shutdown as GRIDCo substation gutted

J N April 11, 2022
Share this Article
Facebook Twitter Whatsapp Whatsapp Copy Link
What do you think?
Love0
Sad0
Cry0
Happy0
Surprise0
Angry0
Wink0
Previous Article Imran Khan: Pakistan PM on brink as confidence vote looms
Next Article Kan-Dapaah has echoed long-held view of perceived bias among judges – Asare

Stay Connected

Facebook Like
Twitter Follow
Instagram Follow
Youtube Subscribe
- Advertisement -
Ad imageAd image

Latest News

court hammer/coup/marriage
Court of Appeal upholds life sentence for Jirapa Dubai hotel murder convict
General Major 4 November 19, 2026
Tottenham man arrested in Dublin over fatal stabbing of 21-year-old in North London
General Major 2 November 19, 2026
Emirates tops Time’s inaugural World’s Best Airlines 2027 rankings
Business Major 2 November 19, 2026
South Africa: Alex Dadey champions intergenerational African businesses, technology and regional partnerships at CNBC Africa Forum
Business Major 1 November 19, 2026
CurrencyRate

You Might also Like

GeneralMajor 3

National grid fault triggers widespread blackout as GRIDCo launches investigation

July 29, 2026
BusinessMajor 1

Selective retirement for energy sector chiefs raise questions

July 17, 2026
BusinessMajor 2

Power outages, weeds disrupt water supply in parts of Accra, Tema – GWL

April 28, 2026
GRIDCo
BusinessMajor 3

Fire chaos forces Akosombo shutdown as GRIDCo substation gutted

April 27, 2026
Show More

Copyright © 2022-2025 The Herald Ghana. All Rights Reserved

Removed from reading list

Undo
Welcome Back!

Sign in to your account

Lost your password?