The Herald ghanaThe Herald ghana
  • Home
  • General
  • Entertainment
  • Politics
  • Editorial
  • Business
  • Sports
  • Feature
  • Health
  • World
Reading: Adenta building collapse: Developer to face arrest for allegedly defying stop-work order – MCE
Share
Aa
The Herald ghanaThe Herald ghana
Aa
  • Home
  • General
  • Entertainment
  • Politics
  • Editorial
  • Business
  • Sports
  • Feature
  • Health
  • World
Search
  • Home
  • General
  • Entertainment
  • Politics
  • Editorial
  • Business
  • Sports
  • Feature
  • Health
  • World
Follow US
  • Advertise
Copyright © 2022 The Herald Ghana. All Rights Reserved
GeneralMajor 3

Adenta building collapse: Developer to face arrest for allegedly defying stop-work order – MCE

Published June 4, 2026 2 Min Read
Share
2 Min Read
Screenshot
SHARE

The Municipal Chief Executive (MCE) for La Nkwantanang–Madina, Ibrahim Fuseini Faila, says the developer of a collapsed building at Adenta will be arrested for allegedly ignoring a stop-work order issued by the Assembly.

According to him, the structure was originally approved for a single-storey building but the developer reportedly continued construction beyond the approved plan despite official directives to halt work.

He said checks with the project engineer confirmed that the owner had been formally instructed to stop construction after breaching the approved building specification.

“I called the engineer and he confirmed that the owner had already been stopped from constructing beyond the approved single-storey building,” the MCE stated.

The MCE alleged that the developer deliberately defied the directive and proceeded with additional construction work despite repeated warnings.

“He refused to listen. Somehow, he found his own means to continue with the project,” he said, adding that the Assembly is now working with the police to track down the individual for arrest and prosecution.

He disclosed that the Assembly had issued an earlier warning about a year ago, instructing the developer to halt all further work, but the order was allegedly ignored.

The MCE described the incident as preventable, attributing the collapse to negligence and non-compliance with building regulations.

He further stated that while some flooding and structural incidents in parts of the region may be linked to natural causes, the Adenta collapse was the result of avoidable violations of planning rules and poor supervision.

According to him, the developer will also be made to bear the full cost of clearing the debris and other related expenses incurred by the Assembly.

“It is the owner’s negligence that has caused this situation. We will ensure he bears the cost of clearing the debris and any other expenses incurred,” he said.

Authorities say efforts are ongoing to ensure the developer is arrested and held accountable in accordance with the law.

ab.teye June 4, 2026
Share this Article
Facebook Twitter Whatsapp Whatsapp Copy Link
What do you think?
Love0
Sad0
Cry0
Happy0
Surprise0
Angry0
Wink0
Previous Article GIS warns foreign nationals after 105 trafficking victims repatriated in Asankragwa operation
Next Article Ghana and Jamaica sign defence, health agreements as cooperation talks resume after two decades

Stay Connected

Facebook Like
Twitter Follow
Instagram Follow
Youtube Subscribe
- Advertisement -
Ad imageAd image

Latest News

court hammer/coup/marriage
Court of Appeal upholds life sentence for Jirapa Dubai hotel murder convict
General Major 4 November 19, 2026
Tottenham man arrested in Dublin over fatal stabbing of 21-year-old in North London
General Major 2 November 19, 2026
Emirates tops Time’s inaugural World’s Best Airlines 2027 rankings
Business Major 2 November 19, 2026
South Africa: Alex Dadey champions intergenerational African businesses, technology and regional partnerships at CNBC Africa Forum
Business Major 1 November 19, 2026
CurrencyRate

Copyright © 2022-2025 The Herald Ghana. All Rights Reserved

Removed from reading list

Undo
Welcome Back!

Sign in to your account

Lost your password?