The Herald ghanaThe Herald ghana
  • Home
  • General
  • Entertainment
  • Politics
  • Editorial
  • Business
  • Sports
  • Feature
  • Health
  • World
Reading: 24H+ Secretariat, Hunan Design Institute sign MOU to advance Volta Economic Corridor Development
Share
Aa
The Herald ghanaThe Herald ghana
Aa
  • Home
  • General
  • Entertainment
  • Politics
  • Editorial
  • Business
  • Sports
  • Feature
  • Health
  • World
Search
  • Home
  • General
  • Entertainment
  • Politics
  • Editorial
  • Business
  • Sports
  • Feature
  • Health
  • World
Follow US
  • Advertise
Copyright © 2022 The Herald Ghana. All Rights Reserved
BusinessMajor 2

24H+ Secretariat, Hunan Design Institute sign MOU to advance Volta Economic Corridor Development

Published April 19, 2026 4 Min Read
Share
4 Min Read
SHARE

The 24-Hour Economy and Accelerated Export Development Secretariat under the Office of the President has signed a Memorandum of Understanding (MOU) with the Hunan Architectural Design Institute Group (HADI Group) of the People’s Republic of China to support the industrial planning of the Volta Economic Corridor (VEC) and attract major infrastructure investments.

The agreement, signed at a ceremony in Accra, is expected to accelerate the implementation of Ghana’s 24-Hour Economy agenda by transforming the Volta Economic Corridor into an investment-ready economic hub.

This was contained in a press statement issued and signed by the Communication Department of the 24-Hour Economy and Accelerated Export Development Secretariat.

Speaking at the event, the leader of the delegation of the Hunan Architectural Design Institute, Chairman He Liu, reaffirmed HADI Group’s readiness to support Ghana’s development vision.

“We are ready to partner for the development of Ghana. Seeing the vision reflected here gives us confidence that this collaboration is built on a strong and practical foundation,” he said.

More Read

Mohammed Amin Adam/NPP/NDC

Minority questions GH¢110m allocation to 24-Hour Economy, demands results before new agenda

24H+ programme to begin construction of Buipe solar project next month
Ghana, UK partners launch Neofingo digital corridor to bridge trade finance gap
24-Hour Economy Secretariat engages Bank of Ghana on policy alignment

On his part, the Presidential Advisor for 24-Hour Economy and Accelerated Export Development, Augustus Goosie Tanoh, recalled earlier discussions held in Changsha, China, in January 2026, which laid the foundation for the agreement.

“When we sat together in Changsha, we agreed that this relationship must be practical. Three months later, here we are,” he stated.

Mr. Tanoh noted that Hunan’s transformation from an agrarian region into a global engineering and construction hub was driven by strategic planning, adding that Ghana was adopting a similar path.

“The institution helped plan the infrastructure that built modern Hunan. We are asking them to bring that same capability to Ghana. The work starts now,” he said.

He described the Volta Economic Corridor as the centrepiece of Ghana’s 24-Hour Economy Programme, aimed at restructuring production, processing, and trade across the country.

The corridor will stretch from the Port of Tema through Akosombo, Afram Plains, Yeji, Buipe, Yapei, and Tamale, and is envisioned as Ghana’s first net-zero green economic corridor.

The project is expected to integrate more than two million hectares of arable land into agroecological parks linked to industrial parks and multimodal transport systems, financed through structured private investment.

Renewable energy installations along the corridor are projected to reduce power costs to below seven cents per kilowatt hour, making local manufacturing more competitive.

The African Development Bank has also committed funding for feasibility studies on the corridor’s multimodal transport component.

Officials estimate that the Volta Economic Corridor will create more than 500,000 direct jobs when fully implemented.

Under the MOU, HADI Group will collaborate with the Secretariat on master planning and spatial design for key development zones, including roads, water supply systems, sewage treatment, and infrastructure networks for agroecological and industrial parks.

The agreement also includes technical training and knowledge exchange between Ghanaian planners and HADI Group engineers.

As part of the initial phase, both parties have agreed to begin pilot projects involving two industrial parks and three agroecological parks along the corridor, with conceptual designs set to commence immediately.

You Might Also Like

Minority questions GH¢110m allocation to 24-Hour Economy, demands results before new agenda

24H+ programme to begin construction of Buipe solar project next month

Ghana, UK partners launch Neofingo digital corridor to bridge trade finance gap

24-Hour Economy Secretariat engages Bank of Ghana on policy alignment

razak.bawa April 19, 2026
Share this Article
Facebook Twitter Whatsapp Whatsapp Copy Link
What do you think?
Love0
Sad0
Cry0
Happy1
Surprise0
Angry0
Wink0
Previous Article President Mahama applauds rapid progress on Tamale Teaching Hospital Cardiology Centre project
Next Article Togbe Afede leads Ghanaian delegation to Global Trade Forum in US

Stay Connected

Facebook Like
Twitter Follow
Instagram Follow
Youtube Subscribe
- Advertisement -
Ad imageAd image

Latest News

Netherlands, Ghana deepen economic ties to boost self-sufficiency
General Major 2 November 19, 2026
court hammer/coup/marriage
Court of Appeal upholds life sentence for Jirapa Dubai hotel murder convict
General Major 4 November 19, 2026
Tottenham man arrested in Dublin over fatal stabbing of 21-year-old in North London
General Major 2 November 19, 2026
Emirates tops Time’s inaugural World’s Best Airlines 2027 rankings
Business Major 2 November 19, 2026
CurrencyRate

You Might also Like

Mohammed Amin Adam/NPP/NDC
GeneralMajor 2

Minority questions GH¢110m allocation to 24-Hour Economy, demands results before new agenda

November 10, 2026
BusinessMajor 2

24H+ programme to begin construction of Buipe solar project next month

July 16, 2026
BusinessMajor 2

Ghana, UK partners launch Neofingo digital corridor to bridge trade finance gap

March 26, 2026
BusinessMajor 4

24-Hour Economy Secretariat engages Bank of Ghana on policy alignment

February 15, 2026
Show More

Copyright © 2022-2025 The Herald Ghana. All Rights Reserved

Removed from reading list

Undo
Welcome Back!

Sign in to your account

Lost your password?