The Herald ghanaThe Herald ghana
  • Home
  • General
  • Entertainment
  • Politics
  • Editorial
  • Business
  • Sports
  • Feature
  • Health
  • World
Reading: Heath Goldfields slapped with 45-day ultimatum to halt Bogoso-Prestea operations
Share
Aa
The Herald ghanaThe Herald ghana
Aa
  • Home
  • General
  • Entertainment
  • Politics
  • Editorial
  • Business
  • Sports
  • Feature
  • Health
  • World
Search
  • Home
  • General
  • Entertainment
  • Politics
  • Editorial
  • Business
  • Sports
  • Feature
  • Health
  • World
Follow US
  • Advertise
Copyright © 2022 The Herald Ghana. All Rights Reserved
GeneralMajor 1

Heath Goldfields slapped with 45-day ultimatum to halt Bogoso-Prestea operations

Published July 6, 2025 3 Min Read
Share
3 Min Read
Armah Kofi-Buah/Small-scale miners/License revocation/GoldBod
SHARE

The Ministry of Lands and Natural Resources has issued a stop work notice to Heath Goldfields, directing the company to immediately cease all mining operations at its Bogoso-Prestea site.

The directive, which took effect on 24 June 2025, was issued following a thorough inspection by the Minerals Commission and a working visit by the sector Minister, Emmanuel Armah-Kofi Buah.

According to a statement released by the Ministry, the decision was taken in line with Regulation 22 of the Minerals and Mining (Health, Safety, and Technical) Regulations, 2012 (L.I. 2182). Heath Goldfields has been granted a 45-day window to address all breaches and continue essential services as outlined by the Chief Inspector of Mines.

The stop work notice follows the company’s failure to meet operational and regulatory standards. Investigations revealed deteriorated land and plant conditions, a non-operational Process Water Treatment Plant, and a poorly maintained Tailings Storage Facility. The site was also found to be overrun by illegal mining activities in certain areas.

Further assessments indicated that the company had defaulted on its contractual obligations, particularly under Section 1.18 of its revised Strategic Mine Development Plan. It was also found to have transported gold-bearing concentrates without obtaining prior written approval from the Ghana Geological Survey Authority and the Minerals Commission, violating Clause 7 of its mining lease.

More Read

GTA shuts down Elmina Beach Resort, others over regulatory breaches ahead of Fetu Afahye

E&P, Heath Goldfields can manage indigenous mining concessions — Sophia Akuffo urges rejection of Gold fields Tarkwa lease renewal
If Heath Goldfields is not qualified to run Damang how can they run Prestea Bogoso Mine which is bigger
Politicians, CSOs & media caught in double standards

In addition, Heath Goldfields is reportedly facing severe operational and financial challenges, including the non-payment of staff salaries. The Ministry revealed that concerned workers had petitioned the Minister over various grievances, prompting an inspection visit to the site on 23 May 2025.

As a result of these breaches, the Ministry has granted Heath Goldfields a 120-day remediation period to rectify all violations, as stipulated under Regulation 200(3) of L.I. 2176 and Clause 27(b) of the Mining Lease Agreement. Failure to comply within this period will result in the termination of the company’s mining licence.

The Ministry emphasised its commitment to ensuring that mining operations in Ghana adhere to the highest standards of safety, environmental sustainability, and legal compliance.

You Might Also Like

GTA shuts down Elmina Beach Resort, others over regulatory breaches ahead of Fetu Afahye

E&P, Heath Goldfields can manage indigenous mining concessions — Sophia Akuffo urges rejection of Gold fields Tarkwa lease renewal

If Heath Goldfields is not qualified to run Damang how can they run Prestea Bogoso Mine which is bigger

Politicians, CSOs & media caught in double standards

ab.teye July 6, 2025
Share this Article
Facebook Twitter Whatsapp Whatsapp Copy Link
What do you think?
Love0
Sad0
Cry0
Happy0
Surprise0
Angry0
Wink0
Previous Article Alexander Kofi-Mensah Mould/MiDA/Grow24/Agriculture MiDA to build on MCC gains for Volta Economic Corridor under Grow24 agenda
Next Article Thomas Partey/Rape/Sexual Assault/Metropolitan Police Thomas Partey denies rape allegations, vows to clear his name

Stay Connected

Facebook Like
Twitter Follow
Instagram Follow
Youtube Subscribe
- Advertisement -
Ad imageAd image

Latest News

court hammer/coup/marriage
Court of Appeal upholds life sentence for Jirapa Dubai hotel murder convict
General Major 4 November 19, 2026
Tottenham man arrested in Dublin over fatal stabbing of 21-year-old in North London
General Major 2 November 19, 2026
Emirates tops Time’s inaugural World’s Best Airlines 2027 rankings
Business Major 2 November 19, 2026
South Africa: Alex Dadey champions intergenerational African businesses, technology and regional partnerships at CNBC Africa Forum
Business Major 1 November 19, 2026
CurrencyRate

You Might also Like

BusinessMajor 4

GTA shuts down Elmina Beach Resort, others over regulatory breaches ahead of Fetu Afahye

August 17, 2026
BusinessMajor 1

E&P, Heath Goldfields can manage indigenous mining concessions — Sophia Akuffo urges rejection of Gold fields Tarkwa lease renewal

May 13, 2026
BusinessMajor 3

If Heath Goldfields is not qualified to run Damang how can they run Prestea Bogoso Mine which is bigger

April 27, 2026
GeneralMajor 1

Politicians, CSOs & media caught in double standards

April 10, 2026
Show More

Copyright © 2022-2025 The Herald Ghana. All Rights Reserved

Removed from reading list

Undo
Welcome Back!

Sign in to your account

Lost your password?