The Herald ghanaThe Herald ghana
  • Home
  • General
  • Entertainment
  • Politics
  • Editorial
  • Business
  • Sports
  • Feature
  • Health
  • World
Reading: Akufo-Addo’s 1,800 km of asphalted roads not newly built – Contractor
Share
Aa
The Herald ghanaThe Herald ghana
Aa
  • Home
  • General
  • Entertainment
  • Politics
  • Editorial
  • Business
  • Sports
  • Feature
  • Health
  • World
Search
  • Home
  • General
  • Entertainment
  • Politics
  • Editorial
  • Business
  • Sports
  • Feature
  • Health
  • World
Follow US
  • Advertise
Copyright © 2022 The Herald Ghana. All Rights Reserved
Politics

Akufo-Addo’s 1,800 km of asphalted roads not newly built – Contractor

Published September 20, 2022 4 Min Read
Share
4 Min Read
SHARE

A Kumasi–based road contractor has negated the president’s assertions that his government has constructed 1,800 kilometres of roads across the country.

President Nana Akufo-Addo, at the beginning of the year, in his sessional address to Parliament, announced that his government had constructed 1,800 kilometres of roads across the country.

The road contractor in arguing his point stated that 80 per cent of the roads contained in the president’s claims are asphalt overlays.

According to the road contractor, the figure bandied about by the president may be true because many of the roads contained in the president’s assertions were asphalt overlays.

Mr Akwasi Yeboah said asphalt overlays are done on already existing roads and not wholly built roads in the country.

More Read

Akufo-Addo tells NPP to unite, rebuild grassroots base ahead of 2028

Gov’t alleges $65m GARID funds were diverted to Covid-19 spending
ECOWAS appoints Akufo-Addo to oversee Benin presidential election
Akufo-Addo installed as Lay Canon in Koforidua

“It is the reason many Ghanaians contested they have not seen that number of roads as contained in the president’s State of the Nation Address (SONA),” he noted.

He stressed that many of these asphalt overlays were done in residential areas of the Accra metropolis and Kumasi metropolis.

“In Kumasi alone, the Manhyia South Constituency with the Minister for Energy, Mathew Opoku Prempeh as the Member of Parliament (MP), was the largest beneficiary of the asphalt overlays,” Mr Yeboah put forth.

Giving a breaking down of the president’s assertion, Mr Yeboah said going by the president’s figures means that each of the 275 constituencies across the country should have at least 39 kilometres of roads.

“As we speak no such feat exists in many of these constituencies across the country,” he narrated.

“It is the reason many of the residents in Kwabre East, Barikese among others in the Ashanti Region demonstrated for not seeing anything in terms of roads in their respective areas,” he said.

He noted that 39 kilometres of roads can journey from the Kumasi-Suame roundabout to the Techiman area in the Bono Region.

Mr Yeboah made these revelations in an interview with Mr Emmanuel Quarshie (The Hitman), host of Accra 100.5 FM’s Ghana Yensom morning show on Tuesday, September 20, 2022.

“Mr Hitman, let me use your medium this morning to correct this notion that has been lingering all this while in relation to roads constructed by this government,” he said.

He commended the president for his quest in ensuring many of the asphalt overlays were done.

He was quick to add that in less than two years, potholes have begun to emerge on many of the roads thereby blaming his colleague contractors for not being forthright in their work.

He said 90 per cent of contractors in the country are not truthful with their jobs.

He added that the contractors did the same thing during John Mahama’s era by building the same asphalt overlays which have diminished.

He disclosed that many recent contractors are doing shoddy jobs compared to roads built in the days of former president J.J Rawlings.

“Some roads built in Rawlings’ era lasted more than 30 years but what are we seeing today? A road is built and in less than two years you start seeing pot holes.

“Many of these roads built by Nana Akufo-Addo are crying for repair works,” he said.

You Might Also Like

Akufo-Addo tells NPP to unite, rebuild grassroots base ahead of 2028

Gov’t alleges $65m GARID funds were diverted to Covid-19 spending

ECOWAS appoints Akufo-Addo to oversee Benin presidential election

Akufo-Addo installed as Lay Canon in Koforidua

J N September 20, 2022
Share this Article
Facebook Twitter Whatsapp Whatsapp Copy Link
What do you think?
Love0
Sad0
Cry0
Happy0
Surprise0
Angry0
Wink0
Previous Article One more body discovered in Wa; kidney, heart and private parts missing
Next Article GNPC risks $1.5 Billion financial loss to Ghana

Stay Connected

Facebook Like
Twitter Follow
Instagram Follow
Youtube Subscribe
- Advertisement -
Ad imageAd image

Latest News

Netherlands, Ghana deepen economic ties to boost self-sufficiency
General Major 2 November 19, 2026
court hammer/coup/marriage
Court of Appeal upholds life sentence for Jirapa Dubai hotel murder convict
General Major 4 November 19, 2026
Tottenham man arrested in Dublin over fatal stabbing of 21-year-old in North London
General Major 2 November 19, 2026
Emirates tops Time’s inaugural World’s Best Airlines 2027 rankings
Business Major 2 November 19, 2026
CurrencyRate

You Might also Like

Major 1Major Politics

Akufo-Addo tells NPP to unite, rebuild grassroots base ahead of 2028

September 17, 2026
GeneralMajor 1

Gov’t alleges $65m GARID funds were diverted to Covid-19 spending

July 7, 2026
Major 1Major Politics

ECOWAS appoints Akufo-Addo to oversee Benin presidential election

March 27, 2026
GeneralMajor 1

Akufo-Addo installed as Lay Canon in Koforidua

March 22, 2026
Show More

Copyright © 2022-2025 The Herald Ghana. All Rights Reserved

Removed from reading list

Undo
Welcome Back!

Sign in to your account

Lost your password?