The Herald ghanaThe Herald ghana
  • Home
  • General
  • Entertainment
  • Politics
  • Editorial
  • Business
  • Sports
  • Feature
  • Health
  • World
Reading: EPA gives Empire Cement 30 days to plan relocation
Share
Aa
The Herald ghanaThe Herald ghana
Aa
  • Home
  • General
  • Entertainment
  • Politics
  • Editorial
  • Business
  • Sports
  • Feature
  • Health
  • World
Search
  • Home
  • General
  • Entertainment
  • Politics
  • Editorial
  • Business
  • Sports
  • Feature
  • Health
  • World
Follow US
  • Advertise
Copyright © 2022 The Herald Ghana. All Rights Reserved
BusinessMajor 2

EPA gives Empire Cement 30 days to plan relocation

Published October 28, 2026 3 Min Read
Share
3 Min Read
EPA/Empire Cement
SHARE

The Environmental Protection Authority (EPA) has given Empire Cement Ghana Limited 30 days to submit a plan to relocate its cement grinding and bagging facility away from the Densu Delta Ramsar Site.

In a directive dated October 28, 2026, and signed by the EPA’s Chief Executive Officer, Prof. Nana Ama Browne Klutse, the Authority said a closure notice issued to the company on September 14 remained in force.

The directive follows longstanding regulatory concerns over the facility’s location, including its proximity to residential communities, Panbros Salt Industries Limited and the environmentally sensitive Densu Delta Ramsar Site.

The EPA said its concerns dated back to June 2020, when it first directed the company to halt construction and identify an alternative site because the proposed location was incompatible with the surrounding land use.

Subsequent environmental assessments also found that large-scale cement manufacturing was unsuitable for the area, citing potential public health risks, flooding and the movement of heavy-duty vehicles through nearby communities.

More Read

Osino/EPA/Zanetor

Zanetor warns Ghana risks losing rivers and farmlands to illegal mining

EPA orders halt to reclamation projects without permits
Ghana launches environmental antimicrobial resistance implementation plan
EPA shuts down Kasoa fuel station over sanitation breaches and flooding risk

Although Empire Cement obtained an environmental permit in October 2023, the EPA said the permit required the company to submit a decommissioning plan and relocate before the permit expired.

The permit conditions were varied in January 2024 following ministerial intervention. However, the Authority said concerns about public health, flooding and heavy-vehicle traffic remained unresolved.

Petitions from residents’ associations in the Weija-Gbawe area to the President and the Minister for Environment, Science and Technology also contributed to renewed calls for regulatory enforcement.

Under Section 35 of the Environmental Protection Act, 2025 (Act 1124), the EPA has directed the company to submit a comprehensive relocation strategy and operational transition plan.

The plan must identify potential industrial sites, implementation timelines, transition arrangements and measures to protect workers.

Empire Cement is also required to identify an alternative location within a designated industrial zone and secure the necessary environmental and land-use approvals, including completing the required environmental impact assessments.

The company must work with the EPA and relevant state institutions to establish an enforceable timetable for decommissioning the existing facility and rehabilitating the site.

The Authority has further directed the company to maintain the environmental safeguards and pollution-control measures required under its existing permit and the closure notice throughout the transition period.

It warned that any unauthorised resumption of operations while the closure notice remains in force could attract sanctions under Act 1124.

You Might Also Like

Zanetor warns Ghana risks losing rivers and farmlands to illegal mining

EPA orders halt to reclamation projects without permits

Ghana launches environmental antimicrobial resistance implementation plan

EPA shuts down Kasoa fuel station over sanitation breaches and flooding risk

ab.teye October 28, 2026
Share this Article
Facebook Twitter Whatsapp Whatsapp Copy Link
What do you think?
Love0
Sad0
Cry0
Happy0
Surprise0
Angry0
Wink0
Previous Article Public sector workers to get 9% pay rise in 2027
Next Article Government launches policy to double local medicine production

Stay Connected

Facebook Like
Twitter Follow
Instagram Follow
Youtube Subscribe
- Advertisement -
Ad imageAd image

Latest News

CFF-Ghana backs Rent Control Commissioner’s intervention in UG hostel fee dispute
General Major 1 November 19, 2026
Korle Bu schedules surgery admission for five-year-old boy after JoyNews report
General Major 4 November 19, 2026
Haruna-Iddrisu/police/sexual misconduct/Bole SHS
Government plans GH¢1.1bn GETFund support for local school furniture production
General Major 3 November 19, 2026
Inflation/Ghana Statistical Service (GSS)
Producer price inflation rises for fourth straight month to 5.2%
Business Major 2 November 19, 2026
CurrencyRate

You Might also Like

Osino/EPA/Zanetor
GeneralMajor 3

Zanetor warns Ghana risks losing rivers and farmlands to illegal mining

October 28, 2026
GeneralMajor 1

EPA orders halt to reclamation projects without permits

October 14, 2026
GeneralMajor 3

Ghana launches environmental antimicrobial resistance implementation plan

August 6, 2026
GeneralMajor 3

EPA shuts down Kasoa fuel station over sanitation breaches and flooding risk

July 10, 2026
Show More

Copyright © 2022-2025 The Herald Ghana. All Rights Reserved

Removed from reading list

Undo
Welcome Back!

Sign in to your account

Lost your password?