The Herald ghanaThe Herald ghana
  • Home
  • General
  • Entertainment
  • Politics
  • Editorial
  • Business
  • Sports
  • Feature
  • Health
  • World
Reading: Tema-TOR road project to resume under Big Push programme
Share
Aa
The Herald ghanaThe Herald ghana
Aa
  • Home
  • General
  • Entertainment
  • Politics
  • Editorial
  • Business
  • Sports
  • Feature
  • Health
  • World
Search
  • Home
  • General
  • Entertainment
  • Politics
  • Editorial
  • Business
  • Sports
  • Feature
  • Health
  • World
Follow US
  • Advertise
Copyright © 2022 The Herald Ghana. All Rights Reserved
GeneralMajor 1

Tema-TOR road project to resume under Big Push programme

Published September 22, 2026 2 Min Read
Share
2 Min Read
Governs Kwame Agbodza/TOR
SHARE

Government has directed the contractor working on the 7.2-kilometre Tema-Tema Oil Refinery (TOR) Road to resume construction under the Big Push Road Projects programme.

The project, which involves the construction of a concrete dual carriageway, was awarded to Joshob Construction Limited in 2020 with an initial 24-month completion period.

However, only about 35 per cent of the works have been completed, with the project cost revised twice since construction began.

Roads and Highways Minister Governs Kwame Agbodza said the government would review the original scope and technical requirements of the project before works resume.

According to him, the project commenced in December 2020 without a comprehensive detailed design and with challenges surrounding the existing contract.

More Read

Ayalolo buses

Mahama orders road markings for Ayalolo contraflow lanes in Accra

Volivo Bridge construction expected to begin by early 2027 – Agbodza
“Show us proof” — Tanker drivers challenge Agbodza over Tema-TOR road
Agbodza defends road inspections with deadlines

He said the review was necessary to ensure the project could be completed within one and a half years under the Big Push programme.

The government, through the Department of Urban Roads, has consequently directed Joshob Construction Limited to resume full operations.

Mr Agbodza said government would cover the cost of the revised works.

“So we are here today to first of all, through Urban Roads, direct you to resume full operations on the project, and we’ll cover the full cost of what we are going to do.

“I’m sure the powers that be with Joshob have been having these discussions with us. We have come to a conclusion, and the President directs that this be completed under his Big Push project,” he said.

The completed road is expected to improve connectivity between Tema and the Tema Oil Refinery area.

You Might Also Like

Mahama orders road markings for Ayalolo contraflow lanes in Accra

Volivo Bridge construction expected to begin by early 2027 – Agbodza

“Show us proof” — Tanker drivers challenge Agbodza over Tema-TOR road

Agbodza defends road inspections with deadlines

ab.teye September 22, 2026
Share this Article
Facebook Twitter Whatsapp Whatsapp Copy Link
What do you think?
Love0
Sad0
Cry0
Happy0
Surprise0
Angry0
Wink0
Previous Article irrigation facilities/Eric Opoku Government to rehabilitate 22 irrigation facilities in Volta Region by 2027
Next Article GPRTU Public transport fares go up 8% from September 26

Stay Connected

Facebook Like
Twitter Follow
Instagram Follow
Youtube Subscribe
- Advertisement -
Ad imageAd image

Latest News

CFF-Ghana welcomes Ablakwa’s readiness to brief parliament on interdicted passport director
General Major 3 November 14, 2026
Ablakwa calls for African Union financial independence, urges urgent institutional reforms
General Major 2 November 14, 2026
Three arrested as police seize suspected fake GTP fabrics worth GH¢20m
General Major 4 November 14, 2026
Gabriel Pwamang nominated to act as Chief Justice
General Major 2 November 14, 2026
CurrencyRate

You Might also Like

Ayalolo buses
GeneralMajor 2

Mahama orders road markings for Ayalolo contraflow lanes in Accra

November 10, 2026
Volivo Brideg
GeneralMajor 3

Volivo Bridge construction expected to begin by early 2027 – Agbodza

November 5, 2026
tanker drivers/BOST
GeneralMajor 4

“Show us proof” — Tanker drivers challenge Agbodza over Tema-TOR road

September 24, 2026
Governs Kwame Agbodza/TOR
GeneralMajor 1

Agbodza defends road inspections with deadlines

September 7, 2026
Show More

Copyright © 2022-2025 The Herald Ghana. All Rights Reserved

Removed from reading list

Undo
Welcome Back!

Sign in to your account

Lost your password?